title: Three-Phase Equipment Installation in Cincinnati | EKS Electric
description: Power for new CNC machines, compressors, production equipment and more, with capacity checks, vendor coordination and planned shutdowns.
---

[![EKS Electric Logo Transparent](https://www.ekselectric.com/hs-fs/hubfs/EKS%20Electric%20Logo%20%20Transparent.png?width=2000&height=2000&name=EKS%20Electric%20Logo%20%20Transparent.png "EKS Electric Logo Transparent")](https://www.ekselectric.com?hsLang=en)

- [Commercial](https://www.ekselectric.com/commercial-electrician-cincinnati/emergency-service/)
- [Industrial](https://www.ekselectric.com/industrial-electrical-contractor-cincinnati/three-phase-equipment-installation/)
- Residential
- [Contact](https://www.ekselectric.com/contact)

![hamburger](https://21644591.fs1.hubspotusercontent-na1.net/hubfs/21644591/hamburger.png)

![close](https://21644591.fs1.hubspotusercontent-na1.net/hubfs/21644591/close.png)

[Book Appointment](https://clienthub.getjobber.com/hubs/f44fd6af-9cfd-4790-936c-a318cb3f9190/public/requests/1877062/new?rwg_token=AE37R_jYL3HnliD32WPfDRUg7qztlKYKo6QrA_eLWhqNzuEya07BASZvFzfIKJGz1l2i0XTS_rd5aUyrxbjP9XSUsvGfZ1ZFSg%3D%3D)

# Three-Phase Power & Equipment Installation

[KNOW MORE](https://www.hubspot.com/)

- [Home](https://www.ekselectric.com?hsLang=en)\>
- Industrial › Three-Phase Power & Equipment Installation

## Three-Phase Power and Equipment Installation in Cincinnati

New equipment doesn't earn anything until it's powered, tested, and running. EKS Electric installs three-phase power and equipment hookups for manufacturers, warehouses, and commercial facilities across Greater Cincinnati and Northern Kentucky. We confirm your building can support the new load, coordinate with your equipment vendor, and schedule shutdowns around your production.

[Request an Equipment Installation Quote](tel:5134130631)

## Equipment We Power

![CNC machines, lathes, mills and fabrication equipment- EKS Electric](https://www.ekselectric.com/hs-fs/hubfs/CNC%20machines%2c%20lathes%2c%20mills%20and%20fabrication%20equipment-%20EKS%20Electric.png?width=250&height=250&name=CNC%20machines%2c%20lathes%2c%20mills%20and%20fabrication%20equipment-%20EKS%20Electric.png)

###### CNC machines, lathes, mills and fabrication equipment

![Air compressors and dryers- EKS Electric](https://www.ekselectric.com/hubfs/Air%20compressors%20and%20dryers-%20EKS%20Electric.png)

###### Air compressors and dryers

![Welders and welding cells- EKS Electric](https://www.ekselectric.com/hubfs/Welders%20and%20welding%20cells-%20EKS%20Electric.png)

###### Welders and welding cells

![Conveyors, packaging and production-line equipment- EKS Electric - EKS Electric](https://www.ekselectric.com/hubfs/Conveyors%2c%20packaging%20and%20production-line%20equipment-%20EKS%20Electric%20-%20EKS%20Electric.png)

###### Conveyors, packaging and production-line equipment

![Industrial HVAC, chillers and process cooling (with your mechanical contractor)- EKS Electric - EKS Electric](https://www.ekselectric.com/hubfs/Industrial%20HVAC%2c%20chillers%20and%20process%20cooling%20(with%20your%20mechanical%20contractor)-%20EKS%20Electric%20-%20EKS%20Electric.png)

###### Industrial HVAC, chillers and process cooling (with your mechanical contractor)

![Pumps, blowers and dust collection- EKS Electric](https://www.ekselectric.com/hubfs/Pumps%2c%20blowers%20and%20dust%20collection-%20EKS%20Electric.png)

###### Pumps, blowers and dust collection

![commercial kitchen and laundry equipment- EKS Electric - EKS Electric](https://www.ekselectric.com/hubfs/commercial%20kitchen%20and%20laundry%20equipment-%20EKS%20Electric%20-%20EKS%20Electric.png)

###### Commercial kitchen and laundry equipment

![industrial electrician- EKS Electric](https://www.ekselectric.com/hubfs/ICONS/industrial%20electrician-%20EKS%20Electric.png)

![ev fleet charging - EKS Electric](https://www.ekselectric.com/hubfs/ev%20fleet%20charging%20-%20EKS%20Electric.png)

###### EV fleet charging equipment → Commercial EV Charging

[![Have New Equipment on the Way? Send us the spec sheet and your target start-up date, and we'll take it from there.   Request an Equipment Installation Quote  ](https://no-cache.hubspot.com/cta/default/52159033/interactive-224578982223.png)](https://www.ekselectric.com/hs/cta/wi/redirect?encryptedPayload=AVxigLKmjfYcQgofXDWq9NCs4ZeKybqTNk6UehV12dcZMUW1QQs%2FXmXPXk28zYdssvEcgW5Yu8QNCygzqWgnSpfxn5c89koymqK44yHRwdE0KQ%2B1gwnR3Pe3JvY42sJDw6%2B8Fzi4Vl3qCC3Xn1j69Jtiipwz2rLpydJhiGP05Azsmh%2FbZxEh2Xk%3D&webInteractiveContentId=224578982223&portalId=52159033&hsLang=en)

## Our Installation Services

**Capacity evaluation and load calculation**  
Before the equipment arrives, we review your existing service, switchgear, and distribution panels to confirm capacity for the new load and tell you what's needed if there isn't. 

**New circuits, feeders and disconnects**  
Correctly sized feeders, overcurrent protection, disconnects, and grounding for each machine, installed to the manufacturer's requirements and code. 

**Distribution and panel additions**  
New panels, transformers for voltage conversion (for example, 480V to 208/120V) and busway or tap boxes where your layout calls for them. 

**Motor controls and VFDs**  
Starters, control wiring, and variable frequency drives for motors and production equipment.  
<https://www.ekselectric.com/industrial-electrical-contractor-cincinnati/motor-controls-vfds/?hsLang=en>

**Equipment relocation and line changes**  
Disconnecting, relocating, and reconnecting equipment when you reconfigure a line or move into a new building.

**Phase conversion questions**  
If the equipment needs three-phase power and your building only has single-phase, we'll explain your options, which may include utility three-phase service or phase-conversion equipment, and the trade-offs of each.

[513-431-0631](tel:5134130631)

## How an Equipment Installation Works

- [How an Equipment Installation Works](https://www.ekselectric.com/industrial-electrical-contractor-cincinnati/three-phase-equipment-installation/#1)
- [Site Visit](https://www.ekselectric.com/industrial-electrical-contractor-cincinnati/three-phase-equipment-installation/#2)
- [Written scope and schedule](https://www.ekselectric.com/industrial-electrical-contractor-cincinnati/three-phase-equipment-installation/#3)
- [Coordination](https://www.ekselectric.com/industrial-electrical-contractor-cincinnati/three-phase-equipment-installation/#4)

 How an Equipment Installation Works

#### Send us the specs

 Voltage, phase, full-load amps or kW, and the manufacturer's installation requirements. The nameplate or spec sheet is usually enough to start. 

[Schedule Appointment](https://clienthub.getjobber.com/hubs/f44fd6af-9cfd-4790-936c-a318cb3f9190/public/requests/1877062/new?rwg_token=AE37R_jYL3HnliD32WPfDRUg7qztlKYKo6QrA_eLWhqNzuEya07BASZvFzfIKJGz1l2i0XTS_rd5aUyrxbjP9XSUsvGfZ1ZFSg%3D%3D)

 Site Visit

#### Site Visit

 We review equipment placement, the existing distribution, the conduit route, and any access constraints. 

[Schedule Appointment](https://clienthub.getjobber.com/hubs/f44fd6af-9cfd-4790-936c-a318cb3f9190/public/requests/1877062/new?rwg_token=AE37R_jYL3HnliD32WPfDRUg7qztlKYKo6QrA_eLWhqNzuEya07BASZvFzfIKJGz1l2i0XTS_rd5aUyrxbjP9XSUsvGfZ1ZFSg%3D%3D)

 Written scope and schedule

#### Written scope and schedule

 You get inclusions, exclusions, lead-time items (gear and transformers can take a while to arrive), and a shutdown plan. 

[Schedule Appointment](https://clienthub.getjobber.com/hubs/f44fd6af-9cfd-4790-936c-a318cb3f9190/public/requests/1877062/new?rwg_token=AE37R_jYL3HnliD32WPfDRUg7qztlKYKo6QrA_eLWhqNzuEya07BASZvFzfIKJGz1l2i0XTS_rd5aUyrxbjP9XSUsvGfZ1ZFSg%3D%3D)

 Coordination

#### Coordination

 We align with your equipment vendor, rigger, mechanical contractor, and the utility where needed. 

[Schedule Appointment](https://clienthub.getjobber.com/hubs/f44fd6af-9cfd-4790-936c-a318cb3f9190/public/requests/1877062/new?rwg_token=AE37R_jYL3HnliD32WPfDRUg7qztlKYKo6QrA_eLWhqNzuEya07BASZvFzfIKJGz1l2i0XTS_rd5aUyrxbjP9XSUsvGfZ1ZFSg%3D%3D)

- [Permits and Installation](https://www.ekselectric.com/industrial-electrical-contractor-cincinnati/three-phase-equipment-installation/#1)
- [Energize and Test](https://www.ekselectric.com/industrial-electrical-contractor-cincinnati/three-phase-equipment-installation/#2)
- [Closeout Documentation](https://www.ekselectric.com/industrial-electrical-contractor-cincinnati/three-phase-equipment-installation/#3)

 Permits and Installation

#### Permits and Installation

 We pull permits, install the work and coordinate inspection. 

[View More](https://www.hubspot.com/)

 Energize and Test

#### Energize and Test

 We verify voltage, phase rotation, and operation with your team or the OEM technician present. 

[Schedule Appointment](https://clienthub.getjobber.com/hubs/f44fd6af-9cfd-4790-936c-a318cb3f9190/public/requests/1877062/new?rwg_token=AE37R_jYL3HnliD32WPfDRUg7qztlKYKo6QrA_eLWhqNzuEya07BASZvFzfIKJGz1l2i0XTS_rd5aUyrxbjP9XSUsvGfZ1ZFSg%3D%3D)

 Closeout Documentation

#### Closeout Documentation

 We update panel schedules and provide a summary of the work. 

[513-413-0631](tel:5134130631)

## What to Have Ready Before You Call

- Equipment make, model, and spec sheet or nameplate photo
- Delivery date and target start-up date
- Planned location on the floor
- Photos of the nearest electrical panel and its label
- Any vendor installation drawings

## Built Around Production

We know a shutdown is a production decision. We plan tie-ins for the shortest practical outage, schedule them for weekends or off-shifts when you need it, and confirm the outage window with you in advance.

 

[513-413-0634](tel:5134130631)

## Three-Phase Installation FAQs

###### How do I know whether my building has enough capacity for new equipment?

We compare the equipment's requirements to your existing service and distribution, including the loads already on it. That's the first step of every installation we quote.

###### How far ahead should I call before the equipment arrives?

As early as you can. Some electrical gear, such as transformers, switchgear, and larger disconnects, can take weeks or months to arrive. Calling when you place the equipment order gives you the most options.

###### Can you work directly with our equipment vendor?

Yes. We coordinate with OEM technicians and installers on requirements, schedules, and start-up.

###### What if our building only has single-phase power?

You can request three-phase service from the utility or use phase-conversion equipment. We'll explain the trade-offs for your equipment and building.

###### Will you need to shut down the power?

Most tie-ins need a short, planned outage for part of the system. We schedule it with you in advance to limit the impact on production.

#### Contact EKS Electric

### Contact Us

[![EKS Electric Logo Yellow Transparent (1)](https://www.ekselectric.com/hs-fs/hubfs/EKS%20Electric%20Logo%20Yellow%20Transparent%20(1).png?width=2000&height=2000&name=EKS%20Electric%20Logo%20Yellow%20Transparent%20(1).png "EKS Electric Logo Yellow Transparent (1)")](https://www.ekselectric.com?hsLang=en)

##### Company

##### Services

##### Get In Touch

## [513-413-0631](tel:5134130631)

## [info@ekselectric.com](mailto:edwin@ekselectric.com)

[Schedule Appointment](https://clienthub.getjobber.com/hubs/f44fd6af-9cfd-4790-936c-a318cb3f9190/public/requests/1877062/new?rwg_token=AE37R_iH0z_LtrXqZI0zHbC6PobWMcNE5_0OlvpR6jbaksDURRE1XMx73WPFOC0lS1Qg7qQ5zAuBtNbGORC5nyW8icbJZKa1XQ%3D%3D)

Copyright © 2026 All Rights Reserved.

[Privacy Poilicy |](https://www.hubspot.com/) [Terms & Condition](https://www.hubspot.com/)